"Your News Now" focuses on Green Data Center

Mark Weldon, executive director for corporate relations at the SU-IBM Data Center, was interviewed on YNN news channel about the center’s energy efficiency.

Going Green: Cooling computers saves energy


Green Data Center

Green Data Center

Green Data Center featured in Progressive Engineer

Progressive Engineer online magazine has posted "Orange Lead the Way" —a story about the Green Data Center at Syracuse University. Read more

A virtual tour of the innovative Green Data Center at Syracuse University:


Facts about the Green Data Center

Because the Green Data Center was constructed in accordance with LEED "Green Building" principles, more than 99 percent of all construction waste generated so far has been recycled. That's over 1,200 tons (about 60 truckloads) of waste that did not go to a standard landfill.

More than 25,000 linear feet of electrical conduit, equivalent to about 83 football fields or 4.5 miles, has been used on the project.

Over 120,000 linear feet—more than 22 miles—of wire was used in the construction of the electrical systems.

Almost one mile of piping is used in the heating and cooling systems.

More facts about the Green Data Center

For more information contact:

IBM
Jeff Couture
Phone: 802.769.2483
jcouture@us.ibm.com

Syracuse University
Kevin Morrow
315.443.3784
kdmorrow@syr.edu